Upgrades & Remodels
Interior
2010 - Master Bathroom and Jack & Jill Bathroom floors - Replaced glossy white 8" ceramic tile with non-slip 16" ceramic tile. Both bathroom toilets have been replaced with water efficient high profile toilets (MB-2011, J&J-2015).
2011 - Kitchen - Replaced counter tops with granite, increasing size of both the island and bar area. Installed 3 sets of pendant lights to modernize look.
2011 - Kitchen - Installed new metallic tile back splash behind stove.
2011 - Kitchen - Replaced all existing appliances with new stainless steel appliances. Installed under-counter double stainless steel sink with upgraded faucet.
2014 - Master Bathroom - Replaced old cultured marble double sinks with granite top & 2 new vessel sinks. Installed 2 new pendant lights over vessel sinks.
2014 - Master Bathroom - Removed old cultured marble shower and installed new ceramic tile shower with stainless steel grab bar and new stainless steel shower head.
Exterior
2010 - Replaced basic front door/sidelights with ornamental style door/sidelights.
2011 - Installed 36" rear garage door.
2013 - Installed power distribution by-pass panel to accommodate A/C generator. Converted portable A/C generator to natural gas and moved gas line to southeast side of house for easy connection to generator.
2013 - Exterior painted with high grade "Loxon" product (2 coats) by Sherwin Williams.
2013 - Installed bypass for lawn sprinkler system with external timer and remote control on-off.
2015 - Upgraded home for max wind resistance via Rebuild North West Florida. Included doubling up strapping on roof-to-wall connections, fitting all windows/door for vinyl shutters, both main garage door and golf cart door replaced with "wind & impact rated" garage doors, rear garage egress door replaced with "wind & impact rated" door/frame, gable end bracing installed on garage roof. These upgrades brought home insurance down from $4000+ per year to $1800 per year (2015 premium).
2018 - Replaced all fogged windows west facing side of house. Also replaced fogged windows on west side of house for dining room.
2018 - December 5th replaced roof with 35 year GAF Timberline HD series premium asphalt shingles.
Pool
2009 - Incorporated spa into main pool. Built heavy duty "fly over" composite deck spanning original spa area. Added under deck lighting and water effect. Created rear and side gates.
2009 - Installed pvc high pressure lines around pool with 3 faucets.
2009 - Installed drip irrigation for pool planters.
2009 - Installed protected A/C line to pool deck with 3 box outlets.
2011 - Installed PVC rail by pool stairs.
2011 - Installed outside shower.
2013 - Refinished gunite pool with two coats of royal blue epoxy.
2014 - Replaced single speed pool pump with new programmable variable speed pump
2015 - Replaced sand filter multi-valve control and also replaced filter sand.
2016 - Replaced T-valves for bottom drain and skimmer.
Lake Deck
2012 - Installed simple 16"x 16" brick decking and steps from pool area to dock area.
2012 - Installed bench seat by decking.
2013 - Installed bumper for pontoon boat docking.
2013 - Installed dock lights.
Other Significant Changes/Replacements
2011 - Replaced A/C handler unit.
2014 - Replaced A/C flex ducts in attic.
2015 - Replaced outside A/C compressor unit.
2018 - Replaced water heater.